
Fleets & commercial
The grid is late. You're not.
Put Level 3 charging on the service your yard already has, in weeks.
Your situation
We start where your site is.
The vehicles arrived first
Apparatus and trucks are on order or already in the bay. The service upgrade is on a different clock.
The utility is working a long queue
Iron is scarce and interconnection studies take years. We take load off that queue instead of adding to it.
Downtime is not an option
Field-replaceable power packs swap a single rack, so maintenance does not park the fleet.
The fit
The families that match.

EVQC · 30 & 60 kW
No-Upgrade Fast Charger · Any-Input · Single Cable
The stationary workhorse for a yard already running 208 or 240 V Delta.
- 30 / 60 kW
- Continuous output
- 250–920 Vdc
- Output voltage
- 95%
- Efficiency

EVQC-M / EVQC-E
Roll-Up Fast Charger
Charging that arrives before the electrician does, and rolls to the next bay after.
- 30–60 kW
- Shop mobile, field-scalable
- 30–50 kW
- Outdoor mobile class
- 250–920 Vdc
- Output voltage

EVBC · 60 kW bi-directional
Bi-Directional Charger
Add this when power out of the vehicle matters as much as power in.
- 60 / 60
- Standard in / out
- 120 kW
- Configurable combined in/out
- 250–920 Vdc
- Output voltage
One utility bill. Two photos.
We read your service and tell you what the yard supports, free.