American-made power technology

Fast charging withoutthe utility upgrade.

Deployed in weeks instead of months using the electrical service you already have. Built in America. No utility service upgrade required.

Any input→ DC out
240 Vac to 480 Vac. One platform.
Weeksnot years
Skip utility queues and transformer waits.
Builtin America
BABA-compliant product line available.
Qualityyou can trust
Engineered, assembled, and supported by Pii.

The old way

No three-phase power?
No problem.

Patent-pending charging solutions that take whatever power you do have and produce reliable fast charging in weeks, not years. Skip 24+ month service upgrade queues, avoid 12+ month equipment lead times, and spend a fraction of the cost of a service upgrade. Pii is your solution partner to optimize what you have today.

0+ MONTHS

Waiting on utility upgrades

0+ MONTHS

Waiting on equipment

AS LITTLE AS 0 WEEKS

Ready to deploy with Pii

We meet you where you are

A modular solution for any existing service.

Tell us what you are trying to solve for and we will match the right charger to your power, your site, and your timeline.

Product lines

A charging solution for every use case.

No service upgrades required. Four product families built on one power platform, so you get the right fit without starting a construction project.

Pii No-Upgrade Fast Charger cabinet lineup

Any panel. Full power.

No-Upgrade Fast Charger

Sites stuck waiting for new three-phase service · Single-phase buildings that need dual-cable power sharing

Main features

  • Three configurations for three-phase, single-phase, or DC-bus sites
  • Field-configurable busbar inputs with no derating
  • 250–920 Vdc output window serves 400 V and 800 V vehicles
  • 30–60 kW continuous output
  • NEMA 3S / IP54 enclosure
  • cETLus listed to UL 2202, UL 2231-1 & -2

Benefits

  • Skip 24+ month utility upgrade queues
  • Stock configurations ship in as little as 3 weeks

Ideal fit

Fleets
Fire
Dealerships
Service shops
Pii mobile charger family

Charging that arrives before the electrician.

Roll-Up Fast Charger

Service lanes and temporary staging lots · Fleets adding vehicles faster than the grid can catch up

Main features

  • Indoor shop mobile and sealed outdoor mobile builds
  • Field-configurable input from 240 V single-phase to 480 V three-phase
  • Rolls between bays or lives in the yard
  • 30–60 kW shop mobile / 30–50 kW outdoor class
  • NEMA 1 / IP20 indoor · NEMA 4 / IP66 outdoor
  • 250–920 Vdc output

Benefits

  • No trench, no permit, no construction delay
  • Moves with the vehicles instead of waiting for infrastructure

Ideal fit

Fleets
Temporary staging
Events
Service lanes
Pii EVPC battery-based off-grid rescue charger

Charges where nothing plugs in.

Off-Grid Rescue Charger

Remote events, rescue fleets, and off-grid lots · Emergency response where the grid cannot reach

Main features

  • 82 kWh LFP battery storage on a skid-mounted platform
  • Recharges from a 240 V single-phase outlet or Level-2 charger
  • Truly mobile: fits a standard ¾-ton pickup bed
  • 30 kW output, 250–920 Vdc
  • 82 kWh LFP storage
  • 96% efficiency · NEMA 3S / IP54

Benefits

  • Deploy DC fast charging where no panel exists
  • Back in service overnight from ordinary shorepower

Ideal fit

Remote sites
Emergency response
Events
Off-grid lots
Pii EVBC bi-directional charger

Vehicle-to-grid (V2G): the vehicle becomes the resource.

Bi-Directional Charger

School districts and student-transport operators · Fleets with a vehicle-to-grid energy strategy

Main features

  • Charging and discharging from one cabinet
  • 60/60 kW standard; configurable to 120 kW combined
  • Closed-loop thermal management for year-round outdoor duty
  • 250–920 Vdc output
  • NEMA 3R / IP54 · −35 °C rated

Benefits

  • Turn parked fleet batteries into site backup power
  • Built for the school-bus and fleet V2G pattern

Ideal fit

School Districts
public transport
V2G
Bidirectional

Patent pending

One charger. Three services.

Field-configurable busbar inputs. Three minutes with the door open, no derating.

Same cabinet. Same output. No derating.

  • Input 1

    240 V single-phase

    The shop panel you already own.

  • Input 2

    208–240 V Delta

    The legacy three-phase most sites still run.

  • Input 3

    480–277 V Wye

    The service you were told to wait four years for.

Why Pii

Four reasons this works.

Power you already have, hardware built here, timelines you can plan around, and engineers who answer.

  • Any power. Full speed.

    High-output charging no matter what's in the panel: single-phase, three-phase, or a DC bus. No service upgrade, no utility queue. Patent-pending busbars switch inputs in minutes.

  • Built here. Backed here.

    Engineered and assembled in American Fork, Utah. Watched 24/7 from a NOC in Plano, Texas. BABA-compliant line ready for federally funded work.

  • Weeks, not years.

    Stock configurations ship in as little as 3 weeks. Field-replaceable modules mean service and upgrades happen at your site in minutes, not at a depot in months.

  • Engineered to you.

    One team from power module to finished product. White-label, custom ODM, or listed modules alone, with an engineer on the line, not a ticket queue.

    Talk to engineering →
Partner with Pii

Become an authorized partner.

Get discounted wholesale pricing, deal registration, co-branded microsites, and engineering support for your projects.

In-house quality

End to end, we do it here.

Engineered, assembled, and serviced by Pii, not handed off between vendors.

Engineered

Designed and tested in American Fork, Utah, with systems and R&D validation in Plano, Texas.

Assembled

Built in our American Fork facility, with BABA-compliant configurations available.

Serviced

Monitored by our 24/7 NOC in Plano, Texas, on every fielded unit.

Start here

One utility bill. Two photos. One week.

Send what you already have and we read the service, size the charger, and tell you what your site can do: free.

01

Your utility bill

One recent PDF or photo.

02

Two photos

Your panel and the parking area.

03

One week

A written read on what your site supports.